Graze Craze
Graze Craze is a renovation/alteration project at 8650 Spicewood Springs Suite 124, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2023). The project has an estimated value of $100K across about 958 sq ft.
๐Project Metrics
TDLR #TABS2023024761Project Closed
Project has been completed and closed
Graze Craze is a Renovation/Alteration project located at 8650 Spicewood Springs Suite 124, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $100K covering 958 sq ft. TIG REAL ESTATE SERVICES INC is the property owner and AKStudio is the design firm of record. The project was registered with TDLR on July 31, 2023.
โFrequently Asked Questions
What is Graze Craze?
Graze Craze is a renovation/alteration project at 8650 Spicewood Springs Suite 124 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior alteration consisting of 958 SF
Is Graze Craze open in Austin?
Construction on Graze Craze is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2023. The building is finished and very likely open.
Where is Graze Craze located?
Graze Craze is located at 8650 Spicewood Springs Suite 124, Austin, TX, 78759, in Travis County.
Who is the owner or developer of Graze Craze?
TIG REAL ESTATE SERVICES INC is the property owner/developer of record for Graze Craze, per its TDLR project registration.
Who is the architect or design firm for Graze Craze?
AKStudio is the design firm of record for Graze Craze, according to its TDLR filing.
How much does Graze Craze cost and how big is it?
Graze Craze has an estimated construction value of $100K and approximately 958 square feet (about $104/sqft), based on its TDLR filing.
๐Scope of Work
Interior alteration consisting of 958 SF
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 31, 2023
Review Complete
Inspection Complete
Closed
Oct 1, 2023
๐Related Projects
๐คSame Owner
$18.5M total๐๏ธSame Design Firm
$6.1M total๐Related City Permits
Building permits found at or near this location
Remodel of a 1250SF restaurant
Install 800A service to refeed the existing building. Existing 800A service and equipment were previously demoed. NOTE TO INSPECTIONS: Make sure no other electrical work is being performed.
Remodel of a 1250SF restaurant
Remodel of a 1250SF restaurant
Electrical disconnect upgrade from 400 to 600 amp **MRT Approved on 25-064455 EP**