Wingstop
Wingstop is a renovation/alteration project at 1515 S. Buckner Blvd. Suite 247B, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $95K across about 1,747 sq ft.
๐Project Metrics
TDLR #TABS2023025453Review Complete
Design review complete, construction may proceed
Wingstop is a Renovation/Alteration project located at 1515 S. Buckner Blvd. Suite 247B, Dallas, TX 75217 in Dallas, Texas. The project has an estimated value of $95K covering 1,747 sq ft. PLEASANT GROVE SHPPG CTR is the property owner and The Dimension Group is the design firm of record. The project was registered with TDLR on August 9, 2023.
โFrequently Asked Questions
What is Wingstop?
Wingstop is a renovation/alteration project at 1515 S. Buckner Blvd. Suite 247B in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior only remodel of an existing Wingstop.
Is Wingstop open in Dallas?
Wingstop is currently under construction in Dallas, TX. Its current TDLR status is "Review Complete".
Where is Wingstop located?
Wingstop is located at 1515 S. Buckner Blvd. Suite 247B, Dallas, TX, 75217, in Dallas County.
Who is the owner or developer of Wingstop?
PLEASANT GROVE SHPPG CTR is the property owner/developer of record for Wingstop, per its TDLR project registration.
Who is the architect or design firm for Wingstop?
The Dimension Group is the design firm of record for Wingstop, according to its TDLR filing.
How much does Wingstop cost and how big is it?
Wingstop has an estimated construction value of $95K and approximately 1,747 square feet (about $54/sqft), based on its TDLR filing.
๐Scope of Work
Interior only remodel of an existing Wingstop.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 9, 2023
Review Complete
Aug 9, 2023
Inspection Complete
Closed