SS111 Fuel Expansion
SS111 Fuel Expansion is a renovation/alteration project at 3107 Seventh Street, Bay City, in Matagorda County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2024). The project has an estimated value of $200K across about 10 sq ft.
๐Project Metrics
TDLR #TABS2023025738Project Closed
Project has been completed and closed
SS111 Fuel Expansion is a Renovation/Alteration project located at 3107 Seventh Street, Bay City, TX 77414 in Bay City, Texas. The project has an estimated value of $200K covering 10 sq ft. Speedy Stop Food Stores, LLC is the property owner and Zemanek Architecture +Design, llc is the design firm of record. The project was registered with TDLR on August 13, 2023.
โFrequently Asked Questions
What is SS111 Fuel Expansion?
SS111 Fuel Expansion is a renovation/alteration project at 3107 Seventh Street in Bay City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Expansion of existing fuel canopy
Is SS111 Fuel Expansion open in Bay City?
Construction on SS111 Fuel Expansion is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2024. The building is finished and very likely open.
Where is SS111 Fuel Expansion located?
SS111 Fuel Expansion is located at 3107 Seventh Street, Bay City, TX, 77414, in Matagorda County.
Who is the owner or developer of SS111 Fuel Expansion?
Speedy Stop Food Stores, LLC is the property owner/developer of record for SS111 Fuel Expansion, per its TDLR project registration.
Who is the architect or design firm for SS111 Fuel Expansion?
Zemanek Architecture +Design, llc is the design firm of record for SS111 Fuel Expansion, according to its TDLR filing.
How much does SS111 Fuel Expansion cost and how big is it?
SS111 Fuel Expansion has an estimated construction value of $200K and approximately 10 square feet (about $20.00K/sqft), based on its TDLR filing.
๐Scope of Work
Expansion of existing fuel canopy
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 13, 2023
Review Complete
Inspection Complete
Closed
Mar 29, 2024