Bomber Spur Trail Phase 1
Bomber Spur Trail Phase 1 is a new construction project at 375' South of US 377 to Calmont Ave, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $5.1M across about 97,000 sq ft.
๐Project Metrics
TDLR #TABS2023025866Review Complete
Design review complete, construction may proceed
Bomber Spur Trail Phase 1 is a New Construction project located at 375' South of US 377 to Calmont Ave, Fort Worth, TX 76116 in Fort Worth, Texas. The project has an estimated value of $5.1M covering 97,000 sq ft. City of Fort Worth is the property owner. The project was registered with TDLR on August 15, 2023.
โFrequently Asked Questions
What is Bomber Spur Trail Phase 1?
Bomber Spur Trail Phase 1 is a new construction project at 375' South of US 377 to Calmont Ave in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Scope includes the installation of a 12' concrete trail from 375' south of US 377 to Calmont Ave, a pedestrian bridge over US 377, 10' concrete shared-use paths to connect at-grade to US 377, and an 8' wide shared-use path along Calmontโฆ
Is Bomber Spur Trail Phase 1 open in Fort Worth?
Bomber Spur Trail Phase 1 is currently under construction in Fort Worth, TX. Its current TDLR status is "Review Complete".
Where is Bomber Spur Trail Phase 1 located?
Bomber Spur Trail Phase 1 is located at 375' South of US 377 to Calmont Ave, Fort Worth, TX, 76116, in Tarrant County.
Who is the owner or developer of Bomber Spur Trail Phase 1?
City of Fort Worth is the property owner/developer of record for Bomber Spur Trail Phase 1, per its TDLR project registration.
How much does Bomber Spur Trail Phase 1 cost and how big is it?
Bomber Spur Trail Phase 1 has an estimated construction value of $5.1M and approximately 97,000 square feet (about $53/sqft), based on its TDLR filing.
๐Scope of Work
Scope includes the installation of a 12' concrete trail from 375' south of US 377 to Calmont Ave, a pedestrian bridge over US 377, 10' concrete shared-use paths to connect at-grade to US 377, and an 8' wide shared-use path along Calmont Ave.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 15, 2023
Review Complete
Aug 15, 2023
Inspection Complete
Closed
๐Related Projects
Property Owner
Registered Accessibility Specialist
Tarrant County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Tarrant County
Find General Contractors in Tarrant