Bathroom addition
Bathroom addition is a renovation/alteration project at 500 S Guadalupe Ste 109, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2024). The project has an estimated value of $175K across about 1,600 sq ft.
๐Project Metrics
TDLR #TABS2024000228Project Closed
Project has been completed and closed
Bathroom addition is a Renovation/Alteration project located at 500 S Guadalupe Ste 109, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $175K covering 1,600 sq ft. Grove Street Holdings LLC is the property owner and HDZ Design / Build LLC is the design firm of record. The project was registered with TDLR on September 6, 2023.
โFrequently Asked Questions
What is Bathroom addition?
Bathroom addition is a renovation/alteration project at 500 S Guadalupe Ste 109 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Add 2 bathrooms add 1 shower add bar top replace HVAC
Is Bathroom addition open in San Marcos?
Construction on Bathroom addition is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2024. The building is finished and very likely open.
Where is Bathroom addition located?
Bathroom addition is located at 500 S Guadalupe Ste 109, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of Bathroom addition?
Grove Street Holdings LLC is the property owner/developer of record for Bathroom addition, per its TDLR project registration.
Who is the architect or design firm for Bathroom addition?
HDZ Design / Build LLC is the design firm of record for Bathroom addition, according to its TDLR filing.
How much does Bathroom addition cost and how big is it?
Bathroom addition has an estimated construction value of $175K and approximately 1,600 square feet (about $109/sqft), based on its TDLR filing.
๐Scope of Work
Add 2 bathrooms add 1 shower add bar top replace HVAC
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 6, 2023
Review Complete
Inspection Complete
Closed
Apr 30, 2024
๐Related City Permits
Building permits found at or near this location
Interior Renovation to accommodate Temporary Offices
Replacement of the PRVs onsite outside each riser room & Replacement of an existing water heater - there are 2 water heaters in building 2 riser room
Trench section of sewer yard line and replace up to city tap
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Building 1 2 Story SFR with attached carport covered porch and patio 3/3.5