Cherry Peak Office Park Phase 2 Building 6 is a new construction project at 3502 Wild Cherry Drive Building 6, Lakeway, TX 78738, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $392K across about 1,960 sq ft.
Project has been completed and closed
Cherry Peak Office Park Phase 2 Building 6 is a New Construction project located at 3502 Wild Cherry Drive Building 6, Lakeway, TX 78738 in Lakeway, Texas. The project has an estimated value of $392K covering 1,960 sq ft. PEAK Design Build, LLC is the property owner and Ascension Architecture, PLLC is the design firm of record. The project was registered with TDLR on September 12, 2023.
Cherry Peak Office Park Phase 2 Building 6 is a new construction project at 3502 Wild Cherry Drive Building 6, Lakeway, TX 78738 in Lakeway, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New single story office building with open office area, single user restroom, and break room, with associated parking and sitework.
Construction on Cherry Peak Office Park Phase 2 Building 6 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.
Cherry Peak Office Park Phase 2 Building 6 is located at 3502 Wild Cherry Drive Building 6, Lakeway, TX 78738, Lakeway, TX, 78738, in Travis County.
PEAK Design Build, LLC is the property owner/developer of record for Cherry Peak Office Park Phase 2 Building 6, per its TDLR project registration.
Ascension Architecture, PLLC is the design firm of record for Cherry Peak Office Park Phase 2 Building 6, according to its TDLR filing.
Cherry Peak Office Park Phase 2 Building 6 has an estimated construction value of $392K and approximately 1,960 square feet (about $200/sqft), based on its TDLR filing.
New single story office building with open office area, single user restroom, and break room, with associated parking and sitework.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 12, 2023
Review Complete
Inspection Complete
Closed
Aug 31, 2024
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with SCH 40 PVC.
Installation of New Irrigation
Installation of New Irrigation
Construct new driveway approach of 18 FT and sidewalk of 70 LF. Driveway approach is in the alley.
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis