Round Rock Medical Center Women's Center Refresh - Phase 2 is a renovation/alteration project at 2400 Round Rock Ave, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $2.5M across about 8,842 sq ft.
Design review complete, construction may proceed
Round Rock Medical Center Women's Center Refresh - Phase 2 is a Renovation/Alteration project located at 2400 Round Rock Ave, Round Rock, TX 78746 in Round Rock, Texas. The project has an estimated value of $2.5M covering 8,842 sq ft. St. David's Round Rock Medical Center is the property owner and Polkinghorn Group Architects, Inc is the design firm of record. The project was registered with TDLR on September 14, 2023.
Round Rock Medical Center Women's Center Refresh - Phase 2 is a renovation/alteration project at 2400 Round Rock Ave in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Existing space modification on Level 1.
Round Rock Medical Center Women's Center Refresh - Phase 2 is currently under construction in Round Rock, TX. Its current TDLR status is "Review Complete".
Round Rock Medical Center Women's Center Refresh - Phase 2 is located at 2400 Round Rock Ave, Round Rock, TX, 78746, in Williamson County.
St. David's Round Rock Medical Center is the property owner/developer of record for Round Rock Medical Center Women's Center Refresh - Phase 2, per its TDLR project registration.
Polkinghorn Group Architects, Inc is the design firm of record for Round Rock Medical Center Women's Center Refresh - Phase 2, according to its TDLR filing.
Round Rock Medical Center Women's Center Refresh - Phase 2 has an estimated construction value of $2.5M and approximately 8,842 square feet (about $283/sqft), based on its TDLR filing.
Existing space modification on Level 1.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 14, 2023
Review Complete
Sep 14, 2023
Inspection Complete
Closed
Building permits found at or near this location
Construct 3 new driveway approaches of 80.5 FT (26.8+ 26.8+ 26.9) and sidewalk of 693 LF and curb & gutter of 50 FT. SP-2024-0310CX 2025 038126 000 00 SSI Phase 3- Sheet 6- Closure allowed for 2 Weeks
Foundation Repair
Commercial rooftop Solar installation 770.18 kw DC.
Express: Foundation repair
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location