📝Review Complete🏗️ New Construction💵 This project is privately funded, on private land for private use.

Ross Road Multifamily

6205 Ross Road, Austin, TX 78617, Austin, TX, 78617
Construction50%

📊Project Metrics

TDLR #TABS2024001178
$62.0M
Project Value
388,028
Square Feet
$160/sqft
Cost/SqFt
2y 4mo
Duration
Registered:Sep 18, 2023
Start:May 25, 2024
Target:Sep 25, 2026
Remaining:214 days
📝

Review Complete

Design review complete, construction may proceed

📋Scope of Work

328 apartments in a 4-story wood framed structure wrapping a 4-tier precast parking structure.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

📅Compliance Timeline

Project Registered
September 18, 2023
Review Complete
September 18, 2023
Construction Start
May 25, 2024
Expected Completion
September 25, 2026

📄Related City Permits

Building permits found at or near this location

6205 N LAMAR BLVD

We will be removing the existing failing grease interceptor and installing a new code¿compliant grease trap in the same general location. Work includes excavation demolition of the existing interceptor installation of new piping connections setting the new interceptor and restoring the work area to grade. Detailed Scope: Excavate to expose the existing grease trap and associated inlet/outlet piping. Disconnect and remove the existing grease interceptor including damaged or non¿compliant piping sections. Install a new (City¿approved) grease interceptor sized per fixture count and City of Austin Industrial Waste requirements. Set the new unit on a properly compacted and leveled base. Reconnect all inlet and outlet plumbing using approved materials and fittings. Install new cleanouts as required by current code. Ensure proper flow line elevations and venting per Austin Water and UPC/IPC requirements. Backfill and compact the excavation area; restore concrete/asphalt or surface material as needed. Perform final testing for watertightness flow and proper operation. Submit required SAWS/Industrial Waste documentation including as¿built information and fixture count verification. No changes to existing building water distribution or sewer layout beyond the grease trap connections. All work will comply with City of Austin Plumbing Code Industrial Waste regulations and Whataburger operational safety requirements.

ActivePlumbing PermitGrease Interceptor (GI) replacementFeb 2026
View Details
2026-016955 PP
🔧Southwaste Disposal
6205 ROSS RD

New commercial irrigation system ref 2024-105641 W

ActivePlumbing PermitIrrigationFeb 2026
View Details
2026-017483 PP
6205 CARRINGTON DR

Express: Replace 4 windows (like for like)

ActiveBuilding PermitRepairFeb 2026
$1
View Details
2026-017548 BP
🔧Home Depot USA Inc
6205 MARSHALL RANCH RD

ePlan: Residential Expedited Review - New Autofill/Heated pool

ActiveMechanical PermitNewJan 2026
View Details
2026-007769 MP
🔧Woods Comfort Systems
6205 MARSHALL RANCH RD

*Model Home* ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 5.5bath]

ActiveElectrical PermitNewOct 2025
View Details
2025-124069 EP
🔧Milestone Community Builders, LLC(MAIN)

Quick Actions

TDLR ID: TABS2024001178

Property Owner

👤
NRP Holdings LLC
Contact: Dominic Marinelli
4 projects · $132.1M
View company profile
c/o The NRP Group LLC 1228 Euclid Avenue, 4th Floor, Cleveland, Ohio 44115

Design Firm

Registered Accessibility Specialist

📋
DOMINIC,MARINELLI
RAS #1437
12034 QUEENS BLVD STE 320, KEW GARDENS, TX 11415

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists