Precision Podiatry Interior Finish-Out is a renovation/alteration project at 201 CR 138 Tenant 1D, Hutto, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $150K across about 1,519 sq ft.
Project has been completed and closed
Precision Podiatry Interior Finish-Out is a Renovation/Alteration project located at 201 CR 138 Tenant 1D, Hutto, TX 78634 in Hutto, Texas. The project has an estimated value of $150K covering 1,519 sq ft. Dunn Drinkard Development Company is the property owner and Polkinghorn Group Architects is the design firm of record. The project was registered with TDLR on September 19, 2023.
Precision Podiatry Interior Finish-Out is a renovation/alteration project at 201 CR 138 Tenant 1D in Hutto, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant finish-out on level 1
Construction on Precision Podiatry Interior Finish-Out is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.
Precision Podiatry Interior Finish-Out is located at 201 CR 138 Tenant 1D, Hutto, TX, 78634, in Williamson County.
Dunn Drinkard Development Company is the property owner/developer of record for Precision Podiatry Interior Finish-Out, per its TDLR project registration.
Polkinghorn Group Architects is the design firm of record for Precision Podiatry Interior Finish-Out, according to its TDLR filing.
Precision Podiatry Interior Finish-Out has an estimated construction value of $150K and approximately 1,519 square feet (about $99/sqft), based on its TDLR filing.
Tenant finish-out on level 1
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 19, 2023
Review Complete
Inspection Complete
Closed
Dec 31, 2023
Building permits found at or near this location
Tunnel under the foundation to repair a break in the PVC drain line in the master bathroom and hall bathroom with SCH 40 PVC. There will be two access holds in front of and behind the house.
Remove existing pool and replace with a new pool with the same specifications.
Partially enclosing the front porch area to add to the living room remodeling throughout of floors bathrooms closets and kitchen reinsulating the exterior walls and siding replacement. No change to impervious cover
Bldg 1 Pool (176sf)
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2.5 Ton AC System