SFFT - Pool Slides
SFFT - Pool Slides is a new construction project at 17000 IH 10 West, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $4.0M across about 625 sq ft.
๐Project Metrics
TDLR #TABS2024001338Project Closed
Project has been completed and closed
SFFT - Pool Slides is a New Construction project located at 17000 IH 10 West, San Antonio, TX 78257 in San Antonio, Texas. The project has an estimated value of $4.0M covering 625 sq ft. Six Flags Fiesta Texas is the property owner and JMS Architects, Inc is the design firm of record. The project was registered with TDLR on September 20, 2023.
โFrequently Asked Questions
What is SFFT - Pool Slides?
SFFT - Pool Slides is a new construction project at 17000 IH 10 West in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Existing pump house will be getting new equipment. Replacing Kiddie pool with 7 slides and a receiving pool.
Is SFFT - Pool Slides open in San Antonio?
Construction on SFFT - Pool Slides is complete โ TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.
Where is SFFT - Pool Slides located?
SFFT - Pool Slides is located at 17000 IH 10 West, San Antonio, TX, 78257, in Bexar County.
Who is the owner or developer of SFFT - Pool Slides?
Six Flags Fiesta Texas is the property owner/developer of record for SFFT - Pool Slides, per its TDLR project registration.
Who is the architect or design firm for SFFT - Pool Slides?
JMS Architects, Inc is the design firm of record for SFFT - Pool Slides, according to its TDLR filing.
How much does SFFT - Pool Slides cost and how big is it?
SFFT - Pool Slides has an estimated construction value of $4.0M and approximately 625 square feet (about $6.40K/sqft), based on its TDLR filing.
๐Scope of Work
Existing pump house will be getting new equipment. Replacing Kiddie pool with 7 slides and a receiving pool.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 20, 2023
Review Complete
Inspection Complete
Closed
May 31, 2024
๐Related Projects
Property Owner
Design Firm
Registered Accessibility Specialist
Bexar County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Bexar County
Find General Contractors in Bexar