Wingstop is a renovation/alteration project at 6338 Lake Worth Blvd., Lake Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2024). The project has an estimated value of $225K across about 1,563 sq ft.
๐Project Metrics
TDLR #TABS2024001700Inspection Complete
Final inspection completed, awaiting project closure
Wingstop is a Renovation/Alteration project located at 6338 Lake Worth Blvd., Lake Worth, TX 76135 in Lake Worth, Texas. The project has an estimated value of $225K covering 1,563 sq ft. TSCA 335 LP is the property owner and The Dimension Group is the design firm of record. The project was registered with TDLR on September 25, 2023.
โFrequently Asked Questions
What is Wingstop?
Wingstop is a renovation/alteration project at 6338 Lake Worth Blvd. in Lake Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of an existing Wingstop restaurant.
Is Wingstop open in Lake Worth?
Construction on Wingstop is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2024. The building is finished and very likely open.
Where is Wingstop located?
Wingstop is located at 6338 Lake Worth Blvd., Lake Worth, TX, 76135, in Tarrant County.
Who is the owner or developer of Wingstop?
TSCA 335 LP is the property owner/developer of record for Wingstop, per its TDLR project registration.
Who is the architect or design firm for Wingstop?
The Dimension Group is the design firm of record for Wingstop, according to its TDLR filing.
How much does Wingstop cost and how big is it?
Wingstop has an estimated construction value of $225K and approximately 1,563 square feet (about $144/sqft), based on its TDLR filing.
๐Scope of Work
Interior remodel of an existing Wingstop restaurant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 25, 2023
Review Complete
Inspection Complete
Apr 30, 2024
Closed