Project has been completed and closed
Emile Elementary Reno is a Renovation/Alteration project located at 601 Martin Luther King Dr., Bastrop, TX 78602 in Bastrop, Texas. The project has an estimated value of $2.6M covering 15,145 sq ft. Bastrop ISD - Barry Edwards is the property owner and Stantec Architecture Inc. is the design firm of record. The project was registered with TDLR on September 25, 2023.
Interior upgrades consisting of new paint, flooring, ceiling, and lighting. Minimal interior rework of floor plan with some new walls, rooms and doors.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 25, 2023
Review Complete
Inspection Complete
Closed
Dec 1, 2024
Building permits found at or near this location
Express- New Windows/ sliding / smoke alarms / recessed lighting / AC / New Tub / Some repair on drywall / New inter doors / flooring / painting
Express- New Windows/ sliding / smoke alarms / recessed lighting / AC / New Tub / Some repair on drywall / New inter doors / flooring / painting
New pool and uncovered wood deck
Express- New Windows/ sliding / smoke alarms / recessed lighting / AC / New Tub / Some repair on drywall / New inter doors / flooring / painting
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [5bed 3bath] Work to include: enclosing existing breezeway and convert carport to garage with accessory studio above [1bed 1bath].