Project has been completed and closed
Emile Elementary Reno is a Renovation/Alteration project located at 601 Martin Luther King Dr., Bastrop, TX 78602 in Bastrop, Texas. The project has an estimated value of $2.6M covering 15,145 sq ft. Bastrop ISD - Barry Edwards is the property owner and Stantec Architecture Inc. is the design firm of record. The project was registered with TDLR on September 25, 2023.
Interior upgrades consisting of new paint, flooring, ceiling, and lighting. Minimal interior rework of floor plan with some new walls, rooms and doors.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 25, 2023
Review Complete
Inspection Complete
Closed
Dec 1, 2024
Building permits found at or near this location
Express: Foundation repair
Replacement of complete existing central heat and air system with or without duct work
Interior Remodel/Garage Conversion Interior bathroom addition within existing garage. Minor partition modifications plumbing fixtures ventilation and electrical work. No change to building footprint. Expired permit (2025-112733 EP) being looped into current project scope
Change of Use from Religious Assembly to Admin/Bus Office with minor interior remodel. 2026-012346 DA
Interior Remodel of kitchen bathrooms and living areas half bath addition conversion of porch into sunroom