Samsung
📊Project Metrics
TDLR #TABS2024001881Project Closed
Project has been completed and closed
📋Scope of Work
A new ~10,000 sf suite on the 15th floor of an existing 24-story building (completed in 2019; permit #2019-010402 PR). New partitions will be constructed for offices, conf. rooms, work rooms, and break room. A new ~4,000 sf corridor will be added.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
🔗Related Projects
📄Related City Permits
Building permits found at or near this location
Initial tenant improvement of first-level suite to create B occupancy office space with meeting rooms employee break room and open office.
o Enterprise Electrical will furnish and install new specified light fixtures. ¿ Per Sheet E2.01 and E0.03 Luminaire Schedule o Enterprise Electrical will install and program all lighting controls as specified. ¿ Per Sheet E2.01 Lighting Control System Notes and Sequence of Operation. o Enterprise Electrical will furnish and install new controlled duplex and GFCI receptacles as listed. ¿ Per Sheet E1-01 o Enterprise Electrical will install new branch circuitry and home runs for power lighting and all equipment. ¿ Per Sheet E1-01 o Enterprise Electrical will furnish and install new floor boxes with Data pathway. ¿ Per Sheet E1-01 o Enterprise Electrical will furnish and install data boxes and conduits. ¿ Per Sheet E1-0 Drawing Notes 5 o Enterprise Electrical will scan and concrete cutting for poke through floor box. ¿ Per Sheet E1-01 o Enterprise Electrical will furnish and install 4 new furniture system wall feeds with connection and termination. ¿ Per Sheet E1-01 Drawing Notes 2 o Enterprise Electrical will furnish and install rough in boxes and conduit for Security Door/Card Readers. ¿ Per Sheet E1-01 Drawing Notes 3 o Enterprise Electrical will furnish and install disconnect of the below mechanical equipment. ¿ WH-A ¿ TP-A ¿ DOAS-1 ¿ CU-1-2 ¿ FCU1-10 ¿ FCU1-11 ¿ FCU1-12 ¿ FCU1-13 ¿ FCU1-14 ¿ FCU1-15 ¿ FCU1-16 ¿ FCU1-17 ¿ FCU1-18 ¿ FCU1-19 ¿ BS-1 ¿ BS-2 ¿ CU-1-20 ¿ FCU-1-20 ¿ CU-1-21 ¿ FCU-1-21 ¿ Per Sheet E03-01 Mechanical/Plumbing Equipment Connection Schedule o Enterprise Electrical will furnish and install the below listed distribution equipment. ¿ Panel H1T ¿ Panel LCLA ¿ 75 KVA Transformer ¿ Per Sheet E4.00 Electrical Riser Diagram o Enterprise Electrical will furnish and install the fire alarm conduits and back boxes. ¿ To be determined once fire alarm drawings are furnished.
Initial tenant improvement of first-level suite to create B occupancy office space with meeting rooms employee break room and open office.
27718 - PayPal Exterior Sign
ePlan: Commercial Expedited Review - First Time Finish-Out for Admin Office (1500 SF)
📐Related Site Plans
City of Austin site plan approvals at this location