N. Pea Ridge Road Phase 2-b is a new construction project at n/a Happy Valley Drive to Airport Road, Temple, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2024). The project has an estimated value of $1.5M across about 1 sq ft.
Project has been completed and closed
N. Pea Ridge Road Phase 2-b is a New Construction project located at n/a Happy Valley Drive to Airport Road, Temple, TX 76502 in Temple, Texas. The project has an estimated value of $1.5M covering 1 sq ft. City of Temple is the property owner. The project was registered with TDLR on September 29, 2023.
N. Pea Ridge Road Phase 2-b is a new construction project at n/a Happy Valley Drive to Airport Road in Temple, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalk, ramps, crosswalks.
Construction on N. Pea Ridge Road Phase 2-b is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2024. The building is finished and very likely open.
N. Pea Ridge Road Phase 2-b is located at n/a Happy Valley Drive to Airport Road, Temple, TX, 76502, in Bell County.
City of Temple is the property owner/developer of record for N. Pea Ridge Road Phase 2-b, per its TDLR project registration.
N. Pea Ridge Road Phase 2-b has an estimated construction value of $1.5M and approximately 1 square feet (about $1500.00K/sqft), based on its TDLR filing.
Sidewalk, ramps, crosswalks.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 29, 2023
Review Complete
Inspection Complete
Closed
Feb 1, 2024