Circle C Swim Center - Renovation
๐Project Metrics
TDLR #TABS2024002710Project Closed
Project has been completed and closed
๐Scope of Work
Interior and minor exterior renovation of community swimming pool restrooms; renovation to showers, restroom flooring, electrical fixtures, and minor cosmetic updates to entry ways of restrooms
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$26.5M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work 2 systems: 3 ton 18 Seer Hybrid System gas
express: foundation repair
express: foundation repair
Gas line to generator . Location is about 6ยฟ from gas meter
Installation of generator and concrete pad