Bagdad Terminus Pump Station Improvements
๐Project Metrics
TDLR #TABS2024003076Review Complete
Design review complete, construction may proceed
๐Scope of Work
renovation of existing City of Leander utility pump station facility, including a new 2,614 SF pump building with office and restroom.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$27.1M total๐๏ธSame Design Firm
$2.0M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Will replace meter box add new ground rods new service wires and conduit
Replacement of an existing water heater replacing tank gas water heater with another tank style gas water heater lcoated in the garage
Express- Foundation repair on a slab foundation. Install 36 total press piling piers including 26 perimeter and 16 interior locations. There will be 16 breakthrough and patched locations. Improve level to the extent.
Liquor Depot