Collett Sublett Road Infrastructure Improvements
Collett Sublett Road Infrastructure Improvements is a renovation/alteration project at 206 Collet Sublett Rd, Kennedale, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $130K across about 13,367 sq ft.
๐Project Metrics
TDLR #TABS2024003766Project Closed
Project has been completed and closed
Collett Sublett Road Infrastructure Improvements is a Renovation/Alteration project located at 206 Collet Sublett Rd, Kennedale, TX 76060 in Kennedale, Texas. The project has an estimated value of $130K covering 13,367 sq ft. City of Kennedale Attention Kristian Sugrim is the property owner and Shield Engineering Group is the design firm of record. The project was registered with TDLR on October 23, 2023.
โFrequently Asked Questions
What is Collett Sublett Road Infrastructure Improvements?
Collett Sublett Road Infrastructure Improvements is a renovation/alteration project at 206 Collet Sublett Rd in Kennedale, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of water, sewer, paving, and drainage facilities including 1365 LF of 12" PVC Waterline, 1312 LF of 8" SS PVC Pipe, 13367 of sidewalk, 4768 SY 6" Conc Pavement, 3120 LF of 6" Conc Curb as well as Storm Drain Line and Flume
Is Collett Sublett Road Infrastructure Improvements open in Kennedale?
Construction on Collett Sublett Road Infrastructure Improvements is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.
Where is Collett Sublett Road Infrastructure Improvements located?
Collett Sublett Road Infrastructure Improvements is located at 206 Collet Sublett Rd, Kennedale, TX, 76060, in Tarrant County.
Who is the owner or developer of Collett Sublett Road Infrastructure Improvements?
City of Kennedale Attention Kristian Sugrim is the property owner/developer of record for Collett Sublett Road Infrastructure Improvements, per its TDLR project registration.
Who is the architect or design firm for Collett Sublett Road Infrastructure Improvements?
Shield Engineering Group is the design firm of record for Collett Sublett Road Infrastructure Improvements, according to its TDLR filing.
How much does Collett Sublett Road Infrastructure Improvements cost and how big is it?
Collett Sublett Road Infrastructure Improvements has an estimated construction value of $130K and approximately 13,367 square feet (about $10/sqft), based on its TDLR filing.
๐Scope of Work
Installation of water, sewer, paving, and drainage facilities including 1365 LF of 12" PVC Waterline, 1312 LF of 8" SS PVC Pipe, 13367 of sidewalk, 4768 SY 6" Conc Pavement, 3120 LF of 6" Conc Curb as well as Storm Drain Line and Flume
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 23, 2023
Review Complete
Inspection Complete
Closed
Dec 1, 2024