22.926 HD is a renovation/alteration project at 3647 E. Evans, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2024). The project has an estimated value of $535K across about 4,280 sq ft.
๐Project Metrics
TDLR #TABS2024005976Project Closed
Project has been completed and closed
22.926 HD is a Renovation/Alteration project located at 3647 E. Evans, San Antonio, TX 78259 in San Antonio, Texas. The project has an estimated value of $535K covering 4,280 sq ft. Birnbaum Property is the property owner and Hill Foley Rossi and Associates is the design firm of record. The project was registered with TDLR on November 22, 2023.
โFrequently Asked Questions
What is 22.926 HD?
22.926 HD is a renovation/alteration project at 3647 E. Evans in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1st generation tenant build out in an existing stand alone shell building
Is 22.926 HD open in San Antonio?
Construction on 22.926 HD is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2024. The building is finished and very likely open.
Where is 22.926 HD located?
22.926 HD is located at 3647 E. Evans, San Antonio, TX, 78259, in Bexar County.
Who is the owner or developer of 22.926 HD?
Birnbaum Property is the property owner/developer of record for 22.926 HD, per its TDLR project registration.
Who is the architect or design firm for 22.926 HD?
Hill Foley Rossi and Associates is the design firm of record for 22.926 HD, according to its TDLR filing.
How much does 22.926 HD cost and how big is it?
22.926 HD has an estimated construction value of $535K and approximately 4,280 square feet (about $125/sqft), based on its TDLR filing.
๐Scope of Work
1st generation tenant build out in an existing stand alone shell building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 22, 2023
Review Complete
Inspection Complete
Closed
Jun 20, 2024