Flint Eastwind Building 2 is a new construction project at Eastwind Industrial Subdivision, Socorro, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $18.5M across about 296,220 sq ft.
Project has been completed and closed
Flint Eastwind Building 2 is a New Construction project located at Eastwind Industrial Subdivision, Socorro, TX 79927 in Socorro, Texas. The project has an estimated value of $18.5M covering 296,220 sq ft. El Paso Logistics II, LLC is the property owner and Davidson Architecture and Engineering is the design firm of record. The project was registered with TDLR on December 4, 2023.
Flint Eastwind Building 2 is a new construction project at Eastwind Industrial Subdivision in Socorro, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Site development and construction of a one story warehouse distribution shell building. No tenant at the present time.
Construction on Flint Eastwind Building 2 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Flint Eastwind Building 2 is located at Eastwind Industrial Subdivision, Socorro, TX, 79927, in El Paso County.
El Paso Logistics II, LLC is the property owner/developer of record for Flint Eastwind Building 2, per its TDLR project registration.
Davidson Architecture and Engineering is the design firm of record for Flint Eastwind Building 2, according to its TDLR filing.
Flint Eastwind Building 2 has an estimated construction value of $18.5M and approximately 296,220 square feet (about $62/sqft), based on its TDLR filing.
Site development and construction of a one story warehouse distribution shell building. No tenant at the present time.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 4, 2023
Review Complete
Inspection Complete
Feb 1, 2025
Closed
Jan 4, 2026
Need a contractor for this project?
Browse verified general contractors active in El Paso County
Find General Contractors in El Paso