Lubbock ISD 2018 Bond HS AgStem Phase 2
Lubbock ISD 2018 Bond HS AgStem Phase 2 is a new construction project at 102 Quaker Ave., Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2024). The project has an estimated value of $2.0M across about 15,470 sq ft.
๐Project Metrics
TDLR #TABS2024006574Project Closed
Project has been completed and closed
Lubbock ISD 2018 Bond HS AgStem Phase 2 is a New Construction project located at 102 Quaker Ave., Lubbock, TX 79416 in Lubbock, Texas. The project has an estimated value of $2.0M covering 15,470 sq ft. Lubbock Independent School District is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on December 4, 2023.
โFrequently Asked Questions
What is Lubbock ISD 2018 Bond HS AgStem Phase 2?
Lubbock ISD 2018 Bond HS AgStem Phase 2 is a new construction project at 102 Quaker Ave. in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Animal barn to be constructed of a pre-engineered metal building with interior CMU partition walls with animal pens. Support spaces will include restrooms, feed storage, mechanical and electrical closets.
Is Lubbock ISD 2018 Bond HS AgStem Phase 2 open in Lubbock?
Construction on Lubbock ISD 2018 Bond HS AgStem Phase 2 is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2024. The building is finished and very likely open.
Where is Lubbock ISD 2018 Bond HS AgStem Phase 2 located?
Lubbock ISD 2018 Bond HS AgStem Phase 2 is located at 102 Quaker Ave., Lubbock, TX, 79416, in Lubbock County.
Who is the owner or developer of Lubbock ISD 2018 Bond HS AgStem Phase 2?
Lubbock Independent School District is the property owner/developer of record for Lubbock ISD 2018 Bond HS AgStem Phase 2, per its TDLR project registration.
Who is the architect or design firm for Lubbock ISD 2018 Bond HS AgStem Phase 2?
Parkhill is the design firm of record for Lubbock ISD 2018 Bond HS AgStem Phase 2, according to its TDLR filing.
How much does Lubbock ISD 2018 Bond HS AgStem Phase 2 cost and how big is it?
Lubbock ISD 2018 Bond HS AgStem Phase 2 has an estimated construction value of $2.0M and approximately 15,470 square feet (about $129/sqft), based on its TDLR filing.
๐Scope of Work
Animal barn to be constructed of a pre-engineered metal building with interior CMU partition walls with animal pens. Support spaces will include restrooms, feed storage, mechanical and electrical closets.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 4, 2023
Review Complete
Inspection Complete
Closed
Sep 3, 2024
๐Related Projects
๐คSame Owner
$153.9M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Lubbock County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Lubbock County
Find General Contractors in Lubbock