Brookshires
Brookshires is a renovation/alteration project at 105 E Ovilla Rd Suite 100, Red Oak, in Ellis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2024). The project has an estimated value of $109K across about 545 sq ft.
๐Project Metrics
TDLR #TABS2024006675Project Closed
Project has been completed and closed
Brookshires is a Renovation/Alteration project located at 105 E Ovilla Rd Suite 100, Red Oak, TX 71112 in Red Oak, Texas. The project has an estimated value of $109K covering 545 sq ft. Brookshires Grocery Co is the property owner and pb2 architecture + engineering is the design firm of record. The project was registered with TDLR on December 5, 2023.
โFrequently Asked Questions
What is Brookshires?
Brookshires is a renovation/alteration project at 105 E Ovilla Rd Suite 100 in Red Oak, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of drive-through pharmacy area.
Is Brookshires open in Red Oak?
Construction on Brookshires is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2024. The building is finished and very likely open.
Where is Brookshires located?
Brookshires is located at 105 E Ovilla Rd Suite 100, Red Oak, TX, 71112, in Ellis County.
Who is the owner or developer of Brookshires?
Brookshires Grocery Co is the property owner/developer of record for Brookshires, per its TDLR project registration.
Who is the architect or design firm for Brookshires?
pb2 architecture + engineering is the design firm of record for Brookshires, according to its TDLR filing.
How much does Brookshires cost and how big is it?
Brookshires has an estimated construction value of $109K and approximately 545 square feet (about $200/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of drive-through pharmacy area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 5, 2023
Review Complete
Inspection Complete
Closed
Jan 19, 2024