Physics Labs 205&206 Renovation is a renovation/alteration project at 210 Ave. A, Denton, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $746K across about 1,461 sq ft.
Project has been completed and closed
Physics Labs 205&206 Renovation is a Renovation/Alteration project located at 210 Ave. A, Denton, TX 76201 in Denton, Texas. The project has an estimated value of $746K covering 1,461 sq ft. University of North Texas is the property owner and Brandstetter Carroll Inc. is the design firm of record. The project was registered with TDLR on December 11, 2023.
Physics Labs 205&206 Renovation is a renovation/alteration project at 210 Ave. A in Denton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovate two existing Physics labs for new laser research labs
Construction on Physics Labs 205&206 Renovation is complete โ TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.
Physics Labs 205&206 Renovation is located at 210 Ave. A, Denton, TX, 76201, in Denton County.
University of North Texas is the property owner/developer of record for Physics Labs 205&206 Renovation, per its TDLR project registration.
Brandstetter Carroll Inc. is the design firm of record for Physics Labs 205&206 Renovation, according to its TDLR filing.
Physics Labs 205&206 Renovation has an estimated construction value of $746K and approximately 1,461 square feet (about $511/sqft), based on its TDLR filing.
Renovate two existing Physics labs for new laser research labs
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 11, 2023
Review Complete
Inspection Complete
Closed
May 10, 2024