Delilah
Delilah is a renovation/alteration project at 1616 Hi Line Drive Suite 110, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.5M across about 15,000 sq ft.
๐Project Metrics
TDLR #TABS2024007374Review Complete
Design review complete, construction may proceed
Delilah is a Renovation/Alteration project located at 1616 Hi Line Drive Suite 110, Dallas, TX 75207 in Dallas, Texas. The project has an estimated value of $1.5M covering 15,000 sq ft. DDD Portfolio Holdings LLC is the property owner and Pistil Consortia LLC is the design firm of record. The project was registered with TDLR on December 14, 2023.
โFrequently Asked Questions
What is Delilah?
Delilah is a renovation/alteration project at 1616 Hi Line Drive Suite 110 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A 15,000 sf tenant improvement from an existing retail building (showroom) into a restaurant.
Is Delilah open in Dallas?
Delilah is currently under construction in Dallas, TX. Its current TDLR status is "Review Complete".
Where is Delilah located?
Delilah is located at 1616 Hi Line Drive Suite 110, Dallas, TX, 75207, in Dallas County.
Who is the owner or developer of Delilah?
DDD Portfolio Holdings LLC is the property owner/developer of record for Delilah, per its TDLR project registration.
Who is the architect or design firm for Delilah?
Pistil Consortia LLC is the design firm of record for Delilah, according to its TDLR filing.
How much does Delilah cost and how big is it?
Delilah has an estimated construction value of $1.5M and approximately 15,000 square feet (about $100/sqft), based on its TDLR filing.
๐Scope of Work
A 15,000 sf tenant improvement from an existing retail building (showroom) into a restaurant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 14, 2023
Review Complete
Dec 14, 2023
Inspection Complete
Closed