Final inspection completed, awaiting project closure
BASIS JLJ Phase II is a Additions to Existing Building project located at 3303 N. Ellison Dr., San Antonio, TX 78251 in San Antonio, Texas. The project has an estimated value of $15.3M covering 35,907 sq ft. BASIS Texas Charter Schools is the property owner and Grace Hebert Curtis Architects is the design firm of record. The project was registered with TDLR on December 19, 2023.
BASIS JLJ Phase II is a additions to existing building project at 3303 N. Ellison Dr., San Antonio, TX 78251 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: PHASE II OF A NEW CHARTER SCHOOL LOCATED IN SAN ANTONIO, TX. PHASE II INCLUDES A TWO-STORY BUILDING, GYMNASIUM, GENERAL LANDSCAPING AND PARKING LOTS. BUILDING TO BE TYPE IIB CONSTRUCTION AND BE EQUIPPED WITH AUTOMATIC FIRE SUPRESSION SYSโฆ
Construction on BASIS JLJ Phase II is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
BASIS JLJ Phase II is located at 3303 N. Ellison Dr., San Antonio, TX 78251, San Antonio, TX, 78251, in Bexar County.
BASIS Texas Charter Schools is the property owner/developer of record for BASIS JLJ Phase II, per its TDLR project registration.
Grace Hebert Curtis Architects is the design firm of record for BASIS JLJ Phase II, according to its TDLR filing.
BASIS JLJ Phase II has an estimated construction value of $15.3M and approximately 35,907 square feet (about $425/sqft), based on its TDLR filing.
PHASE II OF A NEW CHARTER SCHOOL LOCATED IN SAN ANTONIO, TX. PHASE II INCLUDES A TWO-STORY BUILDING, GYMNASIUM, GENERAL LANDSCAPING AND PARKING LOTS. BUILDING TO BE TYPE IIB CONSTRUCTION AND BE EQUIPPED WITH AUTOMATIC FIRE SUPRESSION SYSTEM.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 19, 2023
Review Complete
Dec 19, 2023
Inspection Complete
Jan 18, 2026
Closed
761d
Construction phase