Trinity Metro Bus Pads Phase 1A
Trinity Metro Bus Pads Phase 1A is a renovation/alteration project at Various Addresses across Fort Worth, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2023). The project has an estimated value of $196K across about 3,830 sq ft.
๐Project Metrics
TDLR #TABS2024008336Project Closed
Project has been completed and closed
Trinity Metro Bus Pads Phase 1A is a Renovation/Alteration project located at Various Addresses across Fort Worth, Fort Worth, TX 76102 in Fort Worth, Texas. The project has an estimated value of $196K covering 3,830 sq ft. City of Fort Worth is the property owner and CONSOR Engineers is the design firm of record. The project was registered with TDLR on December 28, 2023.
โFrequently Asked Questions
What is Trinity Metro Bus Pads Phase 1A?
Trinity Metro Bus Pads Phase 1A is a renovation/alteration project at Various Addresses across Fort Worth in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 19 concrete bus stops. Bus stops are new construction, must use transition panels to tie into existing sidewalk. No other facilities to be disturbed.
Is Trinity Metro Bus Pads Phase 1A open in Fort Worth?
Construction on Trinity Metro Bus Pads Phase 1A is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2023. The building is finished and very likely open.
Where is Trinity Metro Bus Pads Phase 1A located?
Trinity Metro Bus Pads Phase 1A is located at Various Addresses across Fort Worth, Fort Worth, TX, 76102, in Tarrant County.
Who is the owner or developer of Trinity Metro Bus Pads Phase 1A?
City of Fort Worth is the property owner/developer of record for Trinity Metro Bus Pads Phase 1A, per its TDLR project registration.
Who is the architect or design firm for Trinity Metro Bus Pads Phase 1A?
CONSOR Engineers is the design firm of record for Trinity Metro Bus Pads Phase 1A, according to its TDLR filing.
How much does Trinity Metro Bus Pads Phase 1A cost and how big is it?
Trinity Metro Bus Pads Phase 1A has an estimated construction value of $196K and approximately 3,830 square feet (about $51/sqft), based on its TDLR filing.
๐Scope of Work
19 concrete bus stops. Bus stops are new construction, must use transition panels to tie into existing sidewalk. No other facilities to be disturbed.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 28, 2023
Review Complete
Inspection Complete
Closed
Mar 31, 2023