Ridgmar Place Reside
Ridgmar Place Reside is a renovation/alteration project at 2151 Green Oaks Rd, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2024). The project has an estimated value of $5.0M across about 230,698 sq ft.
๐Project Metrics
TDLR #TABS2024008435Project Closed
Project has been completed and closed
Ridgmar Place Reside is a Renovation/Alteration project located at 2151 Green Oaks Rd, Fort Worth, TX 76116 in Fort Worth, Texas. The project has an estimated value of $5.0M covering 230,698 sq ft. Welltower Pegasus Landlord LLC is the property owner and Goleski Architectural Design is the design firm of record. The project was registered with TDLR on January 2, 2024.
โFrequently Asked Questions
What is Ridgmar Place Reside?
Ridgmar Place Reside is a renovation/alteration project at 2151 Green Oaks Rd in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace exterior stucco, weather barrier and windows.
Is Ridgmar Place Reside open in Fort Worth?
Construction on Ridgmar Place Reside is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2024. The building is finished and very likely open.
Where is Ridgmar Place Reside located?
Ridgmar Place Reside is located at 2151 Green Oaks Rd, Fort Worth, TX, 76116, in Tarrant County.
Who is the owner or developer of Ridgmar Place Reside?
Welltower Pegasus Landlord LLC is the property owner/developer of record for Ridgmar Place Reside, per its TDLR project registration.
Who is the architect or design firm for Ridgmar Place Reside?
Goleski Architectural Design is the design firm of record for Ridgmar Place Reside, according to its TDLR filing.
How much does Ridgmar Place Reside cost and how big is it?
Ridgmar Place Reside has an estimated construction value of $5.0M and approximately 230,698 square feet (about $22/sqft), based on its TDLR filing.
๐Scope of Work
Replace exterior stucco, weather barrier and windows.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 2, 2024
Review Complete
Inspection Complete
Closed
Mar 31, 2024