๐Project Closed๐๏ธ New Construction๐ต This project involves public funds, public land, or is a Federally funded roadway project.
SHM Pier 121 D Dock Replacement
1481 E. Hillpark Rd, Lewisville, TX 75056, Lewisville, TX, 75056
Completed100%
๐Project Metrics
TDLR #TABS2024008467$4.0M
Project Value
24,400
Square Feet
$163/sqft
Cost/SqFt
3 months
Duration
Registered:Jan 3, 2024
Start:Jan 15, 2024
Target:Apr 15, 2024
๐
Project Closed
Project has been completed and closed
๐Scope of Work
Build a new covered floating dock, with (33) 50' long boat slips, (33) 60' long boat slips, (4) 80' long boat slips and (4) 30' long boat slips. Dock will have shore power and a 3/4" hose bib connection at each slip
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
Project Registered
January 3, 2024
Construction Start
January 15, 2024
Expected Completion
April 15, 2024
๐Related Projects
๐คSame Owner
$13.6M totalProperty Owner
๐ค
SHM PIER 121
Contact: Steven Driscoll
4 projects ยท $13.6M
View company profile
14785 Preston Rd 975, Dallas, Texas 75254
Design Firm
๐๏ธ
SHORESIDE ENGINEERING
4 projects ยท $5.3M
View company profile
1129 Rustic Valley Dr., Roach, Missouri 65787