Rodriguez ES ReSPARK park
Rodriguez ES ReSPARK park is a renovation/alteration project at 5858 Chimney Rock Rd., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2024). The project has an estimated value of $208K across about 1,923 sq ft.
๐Project Metrics
TDLR #TABS2024009062Project Closed
Project has been completed and closed
Rodriguez ES ReSPARK park is a Renovation/Alteration project located at 5858 Chimney Rock Rd., Houston, TX 77081 in Houston, Texas. The project has an estimated value of $208K covering 1,923 sq ft. Houston Independent School District is the property owner and ENVIRONMENTS&co. is the design firm of record. The project was registered with TDLR on January 11, 2024.
โFrequently Asked Questions
What is Rodriguez ES ReSPARK park?
Rodriguez ES ReSPARK park is a renovation/alteration project at 5858 Chimney Rock Rd. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace wood chip fall safety surfacing with artificial turf at existing play unit; provide site furniture on existing concrete paving; provide obstacle course and music components; repair by replacing fabric shade cover material.
Is Rodriguez ES ReSPARK park open in Houston?
Construction on Rodriguez ES ReSPARK park is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2024. The building is finished and very likely open.
Where is Rodriguez ES ReSPARK park located?
Rodriguez ES ReSPARK park is located at 5858 Chimney Rock Rd., Houston, TX, 77081, in Harris County.
Who is the owner or developer of Rodriguez ES ReSPARK park?
Houston Independent School District is the property owner/developer of record for Rodriguez ES ReSPARK park, per its TDLR project registration.
Who is the architect or design firm for Rodriguez ES ReSPARK park?
ENVIRONMENTS&co. is the design firm of record for Rodriguez ES ReSPARK park, according to its TDLR filing.
How much does Rodriguez ES ReSPARK park cost and how big is it?
Rodriguez ES ReSPARK park has an estimated construction value of $208K and approximately 1,923 square feet (about $108/sqft), based on its TDLR filing.
๐Scope of Work
Replace wood chip fall safety surfacing with artificial turf at existing play unit; provide site furniture on existing concrete paving; provide obstacle course and music components; repair by replacing fabric shade cover material.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 11, 2024
Review Complete
Inspection Complete
Closed
Apr 29, 2024