📋Project Registered🏗️ New Construction💵 This project is privately funded, on private land for private use.

NFM On-Site Improvements

750 E New Hope Dr, Cedar Park, TX 78613, Cedar Park, TX, 78613
Pre-Construction15%

📊Project Metrics

TDLR #TABS2024009067
$70.0M
Project Value
5,140,000
Square Feet
$14/sqft
Cost/SqFt
1 months
Duration
Registered:Jan 11, 2024
Start:Apr 1, 2024
Target:Apr 30, 2024
📋

Project Registered

Project has been registered with TDLR and is in pre-construction phase

📋Scope of Work

Mass grading, utility infrastructure, flatwork, and landscaping for a 118-acre mixed use site.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

📅Compliance Timeline

Project Registered
January 11, 2024
Construction Start
April 1, 2024
Expected Completion
April 30, 2024

📄Related City Permits

Building permits found at or near this location

7504 LONG POINT DR

New main 3/4 waterline tap to house

ActivePlumbing PermitRepairMar 2026
View Details
2026-024693 PP
🔧Old Skewl Plumbing and Leak Detection
7505 CLOVE CV

Replace sub-panel and breakers. Bonding of the gas line.

ActiveElectrical PermitRepairMar 2026
View Details
2026-022760 EP
🔧Pritchard Electric
7509 BOYD HAVEN DR

**Project Scope:** Alteration of existing residential irrigation system to expand zone capacity for drip irrigation. **1. Manifold Construction:** Replace an existing 2-valve manifold currently irrigating 2 lawn zones with a new 4-valve manifold. All PVC joints will be chemically welded using purple primer and medium blue PVC cement. **2. Valve Installation:** * Reinstall 2 existing automatic control valves for lawn irrigation zones. * Install 2 new automatic control valves with pressure regulator and filters dedicated to new drip irrigation zones one of which will remain capped on the discharge side for future expansion. **3. Zone Modification** * Permanently remove and cap redundant spray heads on 2 existing lawn zones * Hydrozoning: lawn remains irrigated by 2 existing dedicated zones and new tree planting to be irrigated by the new drip zones. One drip zone is reserved for future expansion.

ActivePlumbing PermitRepairFeb 2026
View Details
2026-023034 PP
7508 PECCARY DR

Replacement of complete existing central heat and air system with or without duct work MELINDA BAYER

ActiveMechanical PermitChange OutFeb 2026
View Details
2026-021391 MP
🔧Strand Brothers Service Experts
7502 DELAFIELD LN

Replace water yard line from the water meter to the home.

ActivePlumbing PermitRepairFeb 2026
View Details
2026-021886 PP
🔧Redbud Plumbing