NFM Subdivision Improvements
📊Project Metrics
TDLR #TABS2024009071Project Registered
Project has been registered with TDLR and is in pre-construction phase
📋Scope of Work
New shared use path and utility relocations/extensions within right-of-way along 118-acre mixed-use site.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
New main 3/4 waterline tap to house
Replace sub-panel and breakers. Bonding of the gas line.
**Project Scope:** Alteration of existing residential irrigation system to expand zone capacity for drip irrigation. **1. Manifold Construction:** Replace an existing 2-valve manifold currently irrigating 2 lawn zones with a new 4-valve manifold. All PVC joints will be chemically welded using purple primer and medium blue PVC cement. **2. Valve Installation:** * Reinstall 2 existing automatic control valves for lawn irrigation zones. * Install 2 new automatic control valves with pressure regulator and filters dedicated to new drip irrigation zones one of which will remain capped on the discharge side for future expansion. **3. Zone Modification** * Permanently remove and cap redundant spray heads on 2 existing lawn zones * Hydrozoning: lawn remains irrigated by 2 existing dedicated zones and new tree planting to be irrigated by the new drip zones. One drip zone is reserved for future expansion.
Replacement of complete existing central heat and air system with or without duct work MELINDA BAYER
Replace water yard line from the water meter to the home.