SHM Pier 121 Transient Dock Replacement
SHM Pier 121 Transient Dock Replacement is a new construction project at 1481 E. Hillpark Rd, Lewisville, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2024). The project has an estimated value of $600K across about 4,070 sq ft.
๐Project Metrics
TDLR #TABS2024009134Project Closed
Project has been completed and closed
SHM Pier 121 Transient Dock Replacement is a New Construction project located at 1481 E. Hillpark Rd, Lewisville, TX 75056 in Lewisville, Texas. The project has an estimated value of $600K covering 4,070 sq ft. SHM Pier 121, LLC is the property owner and Shoreside Engineering, LLC is the design firm of record. The project was registered with TDLR on January 12, 2024.
โFrequently Asked Questions
What is SHM Pier 121 Transient Dock Replacement?
SHM Pier 121 Transient Dock Replacement is a new construction project at 1481 E. Hillpark Rd in Lewisville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Build a new floating dock with (5) 40' long open slips and (7) 30' long open slips.
Is SHM Pier 121 Transient Dock Replacement open in Lewisville?
Construction on SHM Pier 121 Transient Dock Replacement is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2024. The building is finished and very likely open.
Where is SHM Pier 121 Transient Dock Replacement located?
SHM Pier 121 Transient Dock Replacement is located at 1481 E. Hillpark Rd, Lewisville, TX, 75056, in Denton County.
Who is the owner or developer of SHM Pier 121 Transient Dock Replacement?
SHM Pier 121, LLC is the property owner/developer of record for SHM Pier 121 Transient Dock Replacement, per its TDLR project registration.
Who is the architect or design firm for SHM Pier 121 Transient Dock Replacement?
Shoreside Engineering, LLC is the design firm of record for SHM Pier 121 Transient Dock Replacement, according to its TDLR filing.
How much does SHM Pier 121 Transient Dock Replacement cost and how big is it?
SHM Pier 121 Transient Dock Replacement has an estimated construction value of $600K and approximately 4,070 square feet (about $147/sqft), based on its TDLR filing.
๐Scope of Work
Build a new floating dock with (5) 40' long open slips and (7) 30' long open slips.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 12, 2024
Review Complete
Inspection Complete
Closed
Feb 29, 2024
๐Related Projects
๐คSame Owner
$24.3M total๐๏ธSame Design Firm
$17.7M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Denton County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Denton County
Find General Contractors in Denton