Tiger Mountain Center is a new construction project at 100 Mockingbird Hill, Leander, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.9M across about 10,000 sq ft.
Design review complete, construction may proceed
Tiger Mountain Center is a New Construction project located at 100 Mockingbird Hill, Leander, TX 78641 in Leander, Texas. The project has an estimated value of $1.9M covering 10,000 sq ft. Tiger Mountain Center is the property owner and Dwight Patterson Architects is the design firm of record. The project was registered with TDLR on January 24, 2024.
Tiger Mountain Center is a new construction project at 100 Mockingbird Hill in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Two story mixed-use commercial building & archery center
Tiger Mountain Center is currently under construction in Leander, TX. Its current TDLR status is "Review Complete".
Tiger Mountain Center is located at 100 Mockingbird Hill, Leander, TX, 78641, in Williamson County.
Tiger Mountain Center is the property owner/developer of record for Tiger Mountain Center, per its TDLR project registration.
Dwight Patterson Architects is the design firm of record for Tiger Mountain Center, according to its TDLR filing.
Tiger Mountain Center has an estimated construction value of $1.9M and approximately 10,000 square feet (about $190/sqft), based on its TDLR filing.
Two story mixed-use commercial building & archery center
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 24, 2024
Review Complete
Jan 24, 2024
Inspection Complete
Closed
Building permits found at or near this location
CHANGE OF USE MED OFFICE TO PERSONAL USE FITNESS Finish for Fitness Studio in prior demod space
Replacement of complete existing central heat and air system with or without duct work 4-TON HEAT PUMP CONDENSER CHANGE-OUT & 88K BTU AIR HANDLER CHANGE-OUT
Replacement of an existing water heater Replace 40-gallon Gas Water Heater Location: garage closet
CHANGE OF USE MED OFFICE TO PERSONAL USE FITNESS Finish for Fitness Studio in prior demod space
Replacement of complete existing central heat and air system with or without duct work 1 system: 5 Ton Variable Speed Condenser evaporator coil and gas furnace
Need a contractor for this project?
Browse verified general contractors active in Williamson County
Find General Contractors in Williamson