Bucees 28 Bastrop Retrofit
Bucees 28 Bastrop Retrofit is a renovation/alteration project at 1700 Highway 71 East, Bastrop, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $600K across about 1,700 sq ft.
๐Project Metrics
TDLR #TABS2024011006Project Closed
Project has been completed and closed
Bucees 28 Bastrop Retrofit is a Renovation/Alteration project located at 1700 Highway 71 East, Bastrop, TX 78602 in Bastrop, Texas. The project has an estimated value of $600K covering 1,700 sq ft. Buc-ee's LTD is the property owner. The project was registered with TDLR on February 7, 2024.
โFrequently Asked Questions
What is Bucees 28 Bastrop Retrofit?
Bucees 28 Bastrop Retrofit is a renovation/alteration project at 1700 Highway 71 East in Bastrop, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior remodel about 1700 sq. ft. Includes millwork, electrical, plumbing, kitchen equipment and short wall construction
Is Bucees 28 Bastrop Retrofit open in Bastrop?
Construction on Bucees 28 Bastrop Retrofit is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.
Where is Bucees 28 Bastrop Retrofit located?
Bucees 28 Bastrop Retrofit is located at 1700 Highway 71 East, Bastrop, TX, 78602, in Bastrop County.
Who is the owner or developer of Bucees 28 Bastrop Retrofit?
Buc-ee's LTD is the property owner/developer of record for Bucees 28 Bastrop Retrofit, per its TDLR project registration.
How much does Bucees 28 Bastrop Retrofit cost and how big is it?
Bucees 28 Bastrop Retrofit has an estimated construction value of $600K and approximately 1,700 square feet (about $353/sqft), based on its TDLR filing.
๐Scope of Work
interior remodel about 1700 sq. ft. Includes millwork, electrical, plumbing, kitchen equipment and short wall construction
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 7, 2024
Review Complete
Inspection Complete
Apr 15, 2024
Closed
Feb 7, 2026
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Create trench from cleanout up to city tap to replace sewer yard line with schedule 40 PVC line.
Express - Foundation Repair
ePlan: Commercial Expedited Review - Change of Use for Existing Retail space to Allow for Alcohol/Food Sales. (2960 SF)
Express- Primary bathtub shower conversion
ePlan: Commercial Expedited Review - Change of Use for Existing Retail space to Allow for Alcohol/Food Sales. (2960 SF)