Construction complete ยท Apr 2024โœ…Inspection Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

Project Tiger Bldg. 3

201 Logistics Drive Suite 100, Kyle, TX 78640, Kyle, TX, 78640

Project Tiger Bldg. 3 is a new construction project at 201 Logistics Drive Suite 100, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2024). The project has an estimated value of $600K across about 347,180 sq ft.

Final Inspection85%

๐Ÿ“ŠProject Metrics

TDLR #TABS2024011147
$600K
Project Value
347,180
Square Feet
$2/sqft
Cost/SqFt
2 months
Duration
Registered:Feb 8, 2024
Start:Feb 29, 2024
Target:Apr 15, 2024
โœ…

Inspection Complete

Final inspection completed, awaiting project closure

Project Tiger Bldg. 3 is a New Construction project located at 201 Logistics Drive Suite 100, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $600K covering 347,180 sq ft. Yarrington Logistics Owner, LP is the property owner and Seeberger Architecture is the design firm of record. The project was registered with TDLR on February 8, 2024.

โ“Frequently Asked Questions

What is Project Tiger Bldg. 3?

Project Tiger Bldg. 3 is a new construction project at 201 Logistics Drive Suite 100 in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Build-out of an Office/warehouse with light manufacturing within an existing shell building.

Is Project Tiger Bldg. 3 open in Kyle?

Construction on Project Tiger Bldg. 3 is complete โ€” TDLR records show the project passed its required accessibility inspection in Apr 2024. The building is finished and very likely open.

Where is Project Tiger Bldg. 3 located?

Project Tiger Bldg. 3 is located at 201 Logistics Drive Suite 100, Kyle, TX, 78640, in Hays County.

Who is the owner or developer of Project Tiger Bldg. 3?

Yarrington Logistics Owner, LP is the property owner/developer of record for Project Tiger Bldg. 3, per its TDLR project registration.

Who is the architect or design firm for Project Tiger Bldg. 3?

Seeberger Architecture is the design firm of record for Project Tiger Bldg. 3, according to its TDLR filing.

How much does Project Tiger Bldg. 3 cost and how big is it?

Project Tiger Bldg. 3 has an estimated construction value of $600K and approximately 347,180 square feet (about $2/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

Build-out of an Office/warehouse with light manufacturing within an existing shell building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
February 8, 2024
Inspection Complete
April 15, 2024
Construction Start
February 29, 2024
Expected Completion
April 15, 2024

๐Ÿ“…Project Timeline

Filed

Feb 8, 2024

Review Complete

Inspection Complete

Apr 15, 2024

Closed

๐Ÿ“„Related City Permits

Building permits found at or near this location

2015 FORD ST

ePlan: Residential Expedited Review - New construction of a 1-story single family residence with 3 bedroom 2.5 bath rear patio 1 car garage.

ActivePlumbing PermitNewJul 2026
View Details
2026-005469 PP
๐Ÿ”งAccent Plumbing, Inc.
2012 KAREN AVE

EXPRESS: Remodel 2 bathrooms replacing old pipes with new replacing electrical and installing new tile

ActiveBuilding PermitRepairJul 2026
$1
View Details
2026-095822 BP
๐Ÿ”งMaverick Construction
2014 E 10TH ST

New pool for single family use. With plumbing permit.

ActiveElectrical PermitNewJul 2026
View Details
2026-007422 EP
๐Ÿ”งLED ES Electric
2010 S LAMAR BLVD UNIT 300

No construction proposed. CO request to occupy as is. Asking for CO for suite 300 only. Suite 325 is down for reference. Previously approved 2025 128890 PR permitted partitions and corridors for this suite. Office admin.

FinalBuilding PermitRemodelJul 2026
View Details
2026-045619 BP
๐Ÿ”งHarvey-Cleary Builders ***MAIN***
2013 RIVERVIEW ST

Interior remodel mold remediation due to leaks replace flooring cabinets drywall and exterior siding affected areas both baths floor and wall tile remove and replace replace shower valves replace approximately 6-8 studs on exterior walls that have rotting due to water damage on the front and rear walls. Those will need to be replaced with new boards.

ActiveBuilding PermitAddition and RemodelJul 2026
$1
View Details
2026-091606 BP
๐Ÿ”งCapital City Homes, LLC

Quick Actions

TDLR ID: TABS2024011147
๐Ÿ“Š

Hays County Economy

3.6%
Unemployment
$419K
Median Listing
4,595
Bldg Permits/yr
304K
Population
1,660
Active Listings
$92K
Median Income
Source: FRED ยท Updated May 2026
County projects โ†’

Need a contractor for this project?

Browse verified general contractors active in Hays County

Find General Contractors in Hays

Get alerts for Hays

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists