Texoma Medical Center Hybrid OR Suite is a renovation/alteration project at 5016 South U.S. Highway 75, Denison, in Grayson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $4.3M across about 5,160 sq ft.
Project has been completed and closed
Texoma Medical Center Hybrid OR Suite is a Renovation/Alteration project located at 5016 South U.S. Highway 75, Denison, TX 75020 in Denison, Texas. The project has an estimated value of $4.3M covering 5,160 sq ft. Texoma Medical Center is the property owner and Gresham Smith is the design firm of record. The project was registered with TDLR on February 28, 2024.
Texoma Medical Center Hybrid OR Suite is a renovation/alteration project at 5016 South U.S. Highway 75 in Denison, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of shell and physician reading room space to one Hybrid room, control room and supporting functional spaces.
Construction on Texoma Medical Center Hybrid OR Suite is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.
Texoma Medical Center Hybrid OR Suite is located at 5016 South U.S. Highway 75, Denison, TX, 75020, in Grayson County.
Texoma Medical Center is the property owner/developer of record for Texoma Medical Center Hybrid OR Suite, per its TDLR project registration.
Gresham Smith is the design firm of record for Texoma Medical Center Hybrid OR Suite, according to its TDLR filing.
Texoma Medical Center Hybrid OR Suite has an estimated construction value of $4.3M and approximately 5,160 square feet (about $828/sqft), based on its TDLR filing.
Renovation of shell and physician reading room space to one Hybrid room, control room and supporting functional spaces.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 28, 2024
Review Complete
Inspection Complete
Nov 18, 2024
Closed
Mar 12, 2026