Braum's #189
Braum's #189 is a renovation/alteration project at 300 S. Cedar St., Borger, in Hutchinson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2025). The project has an estimated value of $125K across about 4,064 sq ft.
๐Project Metrics
TDLR #TABS2024014250Project Closed
Project has been completed and closed
Braum's #189 is a Renovation/Alteration project located at 300 S. Cedar St., Borger, TX 79007 in Borger, Texas. The project has an estimated value of $125K covering 4,064 sq ft. Retail Buildings Inc. is the property owner and Reprise Design, Inc. is the design firm of record. The project was registered with TDLR on March 20, 2024.
โFrequently Asked Questions
What is Braum's #189?
Braum's #189 is a renovation/alteration project at 300 S. Cedar St. in Borger, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of existing building. Small addition of 86sf.
Is Braum's #189 open in Borger?
Construction on Braum's #189 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2025. The building is finished and very likely open.
Where is Braum's #189 located?
Braum's #189 is located at 300 S. Cedar St., Borger, TX, 79007, in Hutchinson County.
Who is the owner or developer of Braum's #189?
Retail Buildings Inc. is the property owner/developer of record for Braum's #189, per its TDLR project registration.
Who is the architect or design firm for Braum's #189?
Reprise Design, Inc. is the design firm of record for Braum's #189, according to its TDLR filing.
How much does Braum's #189 cost and how big is it?
Braum's #189 has an estimated construction value of $125K and approximately 4,064 square feet (about $31/sqft), based on its TDLR filing.
๐Scope of Work
Interior remodel of existing building. Small addition of 86sf.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 20, 2024
Review Complete
Inspection Complete
Closed
Jan 27, 2025