HEADSTONE WORLD DALLAS LLC Phase 2 is a renovation/alteration project at 1805 Town East Blvd, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $200K across about 1 sq ft.
Design review complete, construction may proceed
HEADSTONE WORLD DALLAS LLC Phase 2 is a Renovation/Alteration project located at 1805 Town East Blvd, Mesquite, TX 75149 in Mesquite, Texas. The project has an estimated value of $200K covering 1 sq ft. HEADSTONE WORLD DALLAS LLC is the property owner and Ward Architecture PLLC is the design firm of record. The project was registered with TDLR on March 28, 2024.
HEADSTONE WORLD DALLAS LLC Phase 2 is a renovation/alteration project at 1805 Town East Blvd in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: rework of exterior paving, fence, canopy, dumpster enclosure and addition of new overhead door
HEADSTONE WORLD DALLAS LLC Phase 2 is currently under construction in Mesquite, TX. Its current TDLR status is "Review Complete".
HEADSTONE WORLD DALLAS LLC Phase 2 is located at 1805 Town East Blvd, Mesquite, TX, 75149, in Dallas County.
HEADSTONE WORLD DALLAS LLC is the property owner/developer of record for HEADSTONE WORLD DALLAS LLC Phase 2, per its TDLR project registration.
Ward Architecture PLLC is the design firm of record for HEADSTONE WORLD DALLAS LLC Phase 2, according to its TDLR filing.
HEADSTONE WORLD DALLAS LLC Phase 2 has an estimated construction value of $200K and approximately 1 square feet (about $200.00K/sqft), based on its TDLR filing.
rework of exterior paving, fence, canopy, dumpster enclosure and addition of new overhead door
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 28, 2024
Review Complete
Mar 28, 2024
Inspection Complete
Closed