MRCC Linac Replacement
MRCC Linac Replacement is a renovation/alteration project at 2805 E. George Bush Freeway, Richardson, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $329K across about 1,100 sq ft.
๐Project Metrics
TDLR #TABS2024015382Review Complete
Design review complete, construction may proceed
MRCC Linac Replacement is a Renovation/Alteration project located at 2805 E. George Bush Freeway, Richardson, TX 75080 in Richardson, Texas. The project has an estimated value of $329K covering 1,100 sq ft. Methodist Medical Group is the property owner and Modus Architecture is the design firm of record. The project was registered with TDLR on April 3, 2024.
โFrequently Asked Questions
What is MRCC Linac Replacement?
MRCC Linac Replacement is a renovation/alteration project at 2805 E. George Bush Freeway in Richardson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project is an update of an existing linear accelerator within an existing vault.
Is MRCC Linac Replacement open in Richardson?
MRCC Linac Replacement is currently under construction in Richardson, TX. Its current TDLR status is "Review Complete".
Where is MRCC Linac Replacement located?
MRCC Linac Replacement is located at 2805 E. George Bush Freeway, Richardson, TX, 75080, in Dallas County.
Who is the owner or developer of MRCC Linac Replacement?
Methodist Medical Group is the property owner/developer of record for MRCC Linac Replacement, per its TDLR project registration.
Who is the architect or design firm for MRCC Linac Replacement?
Modus Architecture is the design firm of record for MRCC Linac Replacement, according to its TDLR filing.
How much does MRCC Linac Replacement cost and how big is it?
MRCC Linac Replacement has an estimated construction value of $329K and approximately 1,100 square feet (about $299/sqft), based on its TDLR filing.
๐Scope of Work
Project is an update of an existing linear accelerator within an existing vault.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 3, 2024
Review Complete
Apr 3, 2024
Inspection Complete
Closed