Methodist Surgery Center is a renovation/alteration project at 3001 East President George Bush Highway, Richardson, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $12.0M across about 17,000 sq ft.
Final inspection completed, awaiting project closure
Methodist Surgery Center is a Renovation/Alteration project located at 3001 East President George Bush Highway, Richardson, TX 75082 in Richardson, Texas. The project has an estimated value of $12.0M covering 17,000 sq ft. PAVILION PROPERTIES is the property owner and Ryan A+E, Inc. is the design firm of record. The project was registered with TDLR on April 12, 2024.
Methodist Surgery Center is a renovation/alteration project at 3001 East President George Bush Highway in Richardson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel existing suite into an ambulatory surgery center.
Construction on Methodist Surgery Center is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.
Methodist Surgery Center is located at 3001 East President George Bush Highway, Richardson, TX, 75082, in Collin County.
PAVILION PROPERTIES is the property owner/developer of record for Methodist Surgery Center, per its TDLR project registration.
Ryan A+E, Inc. is the design firm of record for Methodist Surgery Center, according to its TDLR filing.
Methodist Surgery Center has an estimated construction value of $12.0M and approximately 17,000 square feet (about $706/sqft), based on its TDLR filing.
Remodel existing suite into an ambulatory surgery center.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 12, 2024
Review Complete
Apr 12, 2024
Inspection Complete
Feb 5, 2026
Closed
664d
Construction phase