Shipley Do-Nuts
Shipley Do-Nuts is a renovation/alteration project at 22618 FM 2920, Hockley, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $250K across about 1,798 sq ft.
๐Project Metrics
TDLR #TABS2024016286Review Complete
Design review complete, construction may proceed
Shipley Do-Nuts is a Renovation/Alteration project located at 22618 FM 2920, Hockley, TX 77447 in Hockley, Texas. The project has an estimated value of $250K covering 1,798 sq ft. Shops at Bauer Landing LLC is the property owner and Excel Engineering is the design firm of record. The project was registered with TDLR on April 16, 2024.
โFrequently Asked Questions
What is Shipley Do-Nuts?
Shipley Do-Nuts is a renovation/alteration project at 22618 FM 2920 in Hockley, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1,798 square foot tenant build out of a donut shop including MEP.
Is Shipley Do-Nuts open in Hockley?
Shipley Do-Nuts is currently under construction in Hockley, TX. Its current TDLR status is "Review Complete".
Where is Shipley Do-Nuts located?
Shipley Do-Nuts is located at 22618 FM 2920, Hockley, TX, 77447, in Harris County.
Who is the owner or developer of Shipley Do-Nuts?
Shops at Bauer Landing LLC is the property owner/developer of record for Shipley Do-Nuts, per its TDLR project registration.
Who is the architect or design firm for Shipley Do-Nuts?
Excel Engineering is the design firm of record for Shipley Do-Nuts, according to its TDLR filing.
How much does Shipley Do-Nuts cost and how big is it?
Shipley Do-Nuts has an estimated construction value of $250K and approximately 1,798 square feet (about $139/sqft), based on its TDLR filing.
๐Scope of Work
1,798 square foot tenant build out of a donut shop including MEP.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 16, 2024
Review Complete
Apr 16, 2024
Inspection Complete
Closed