Nutrabolt Day2 - Recovery Area
๐Project Metrics
TDLR #TABS2024018210Project Closed
Project has been completed and closed
๐Scope of Work
Minor Alteration with new partition and door to subdivide single room into two rooms. New finishes, light fixtures, and millwork in Recovery Area. Approximately 330sf for new rooms, and additional 830sf for new finishes/fixtures/millwork.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$2.3M total๐๏ธSame Design Firm
$2.3M total๐Related City Permits
Building permits found at or near this location
temp power for jobsite trailer for the duration of construction Permit and ESPA will need a unique address. 3324 1/2 s fm 620 is already being used by meter 6127109.
yard sewer spot repair and 10 tunnel below the foundation to repair master bath drain line.1 access - left
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 ton horizontal gas system
Relocate overhead primary to underground.
New 1600-amp service in the ETJ