Office Renovation - 2nd Floor Manager Offices is a renovation/alteration project at 1609 Centre Creek Dr., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $180K across about 900 sq ft.
Design review complete, construction may proceed
Office Renovation - 2nd Floor Manager Offices is a Renovation/Alteration project located at 1609 Centre Creek Dr., Austin, TX 78754 in Austin, Texas. The project has an estimated value of $180K covering 900 sq ft. 1609 Centre Creek LTd., c/o Live Oak is the property owner and Deloitte is the design firm of record. The project was registered with TDLR on May 15, 2024.
Office Renovation - 2nd Floor Manager Offices is a renovation/alteration project at 1609 Centre Creek Dr. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacing existing workstation (cubicles) in open areas with three manager offices.
Office Renovation - 2nd Floor Manager Offices is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Office Renovation - 2nd Floor Manager Offices is located at 1609 Centre Creek Dr., Austin, TX, 78754, in Travis County.
1609 Centre Creek LTd., c/o Live Oak is the property owner/developer of record for Office Renovation - 2nd Floor Manager Offices, per its TDLR project registration.
Deloitte is the design firm of record for Office Renovation - 2nd Floor Manager Offices, according to its TDLR filing.
Office Renovation - 2nd Floor Manager Offices has an estimated construction value of $180K and approximately 900 square feet (about $200/sqft), based on its TDLR filing.
Replacing existing workstation (cubicles) in open areas with three manager offices.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
May 15, 2024
Review Complete
May 15, 2024
Inspection Complete
Closed
Building permits found at or near this location
A four-zone system containing two MP rotor zones one drip and one Tree Bubblers. One extra valve for the feature.
Excvate 18 tunnel to repair main drain line under house excavate 8 trench to repair main drin line in yard
Replacement of complete existing central heat and air system with or without duct work 2.5T gas system replacement
Express: Foundation repair (install 39 total pilings)
Covered porch enclosure. enclose to make a gym space.