Office Renovation - 2nd Floor Manager Offices
📊Project Metrics
TDLR #TABS2024018556Review Complete
Design review complete, construction may proceed
📋Scope of Work
Replacing existing workstation (cubicles) in open areas with three manager offices.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
ePlan: Residential Expedited Review - New Autofill Pool w/SPA. Bldg 1
Add HVAC. Relocate the existing laundry to the closet. Repair and replace plumbing and gas lines as needed. Add recessed lighting and additional outlets. Convert tub to shower. Move the bathroom sink and toilet to meet code requirements. Relocate kitchen sink to different wall in kitchen.
Add HVAC. Relocate the existing laundry to the closet. Repair and replace plumbing and gas lines as needed. Add recessed lighting and additional outlets. Convert tub to shower. Move the bathroom sink and toilet to meet code requirements. Relocate kitchen sink to different wall in kitchen.
Add HVAC. Relocate the existing laundry to the closet. Repair and replace plumbing and gas lines as needed. Add recessed lighting and additional outlets. Convert tub to shower. Move the bathroom sink and toilet to meet code requirements. Relocate kitchen sink to different wall in kitchen.
Replacement of complete existing central heat and air system with or without duct work