Spec Suite 200
Spec Suite 200 is a renovation/alteration project at 2221 E. Lamar Blvd., Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2024). The project has an estimated value of $158K across about 2,431 sq ft.
๐Project Metrics
TDLR #TABS2024019467Project Closed
Project has been completed and closed
Spec Suite 200 is a Renovation/Alteration project located at 2221 E. Lamar Blvd., Arlington, TX 76006 in Arlington, Texas. The project has an estimated value of $158K covering 2,431 sq ft. Brookhollow II Holdings, LP is the property owner and ENTOS is the design firm of record. The project was registered with TDLR on May 28, 2024.
โFrequently Asked Questions
What is Spec Suite 200?
Spec Suite 200 is a renovation/alteration project at 2221 E. Lamar Blvd. in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Capital Improvement
Is Spec Suite 200 open in Arlington?
Construction on Spec Suite 200 is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2024. The building is finished and very likely open.
Where is Spec Suite 200 located?
Spec Suite 200 is located at 2221 E. Lamar Blvd., Arlington, TX, 76006, in Tarrant County.
Who is the owner or developer of Spec Suite 200?
Brookhollow II Holdings, LP is the property owner/developer of record for Spec Suite 200, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 200?
ENTOS is the design firm of record for Spec Suite 200, according to its TDLR filing.
How much does Spec Suite 200 cost and how big is it?
Spec Suite 200 has an estimated construction value of $158K and approximately 2,431 square feet (about $65/sqft), based on its TDLR filing.
๐Scope of Work
Capital Improvement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 28, 2024
Review Complete
Inspection Complete
Closed
Sep 1, 2024