Stillwater HQ
Stillwater HQ is a new construction project at 4145 Travis Street, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $31.0M across about 143,921 sq ft.
๐Project Metrics
TDLR #TABS2024020909Review Complete
Design review complete, construction may proceed
Stillwater HQ is a New Construction project located at 4145 Travis Street, Dallas, TX 75204 in Dallas, Texas. The project has an estimated value of $31.0M covering 143,921 sq ft. Pacific Elm Properties is the property owner and The Beck Group is the design firm of record. The project was registered with TDLR on June 14, 2024.
โFrequently Asked Questions
What is Stillwater HQ?
Stillwater HQ is a new construction project at 4145 Travis Street in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Multi-tenant core and shell office building with 4 floors of office tenant spaces from level 02-05. Also includes parking garage at level B2,B1 and 01. site is 0.9139 acres.
Is Stillwater HQ open in Dallas?
Stillwater HQ is currently under construction in Dallas, TX. Its current TDLR status is "Review Complete".
Where is Stillwater HQ located?
Stillwater HQ is located at 4145 Travis Street, Dallas, TX, 75204, in Dallas County.
Who is the owner or developer of Stillwater HQ?
Pacific Elm Properties is the property owner/developer of record for Stillwater HQ, per its TDLR project registration.
Who is the architect or design firm for Stillwater HQ?
The Beck Group is the design firm of record for Stillwater HQ, according to its TDLR filing.
How much does Stillwater HQ cost and how big is it?
Stillwater HQ has an estimated construction value of $31.0M and approximately 143,921 square feet (about $215/sqft), based on its TDLR filing.
๐Scope of Work
Multi-tenant core and shell office building with 4 floors of office tenant spaces from level 02-05. Also includes parking garage at level B2,B1 and 01. site is 0.9139 acres.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 14, 2024
Review Complete
Jun 14, 2024
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$393.8M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Dallas County
Find General Contractors in Dallas