Walmart 217-ESS is a renovation/alteration project at 801 W. Main St, Lewisville, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2025). The project has an estimated value of $115K across about 100 sq ft.
๐Project Metrics
TDLR #TABS2024021421Project Closed
Project has been completed and closed
Walmart 217-ESS is a Renovation/Alteration project located at 801 W. Main St, Lewisville, TX 75067 in Lewisville, Texas. The project has an estimated value of $115K covering 100 sq ft. Walmart is the property owner and pb2 architecture + engineering is the design firm of record. The project was registered with TDLR on June 21, 2024.
โFrequently Asked Questions
What is Walmart 217-ESS?
Walmart 217-ESS is a renovation/alteration project at 801 W. Main St in Lewisville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Install emergency exit doors
Is Walmart 217-ESS open in Lewisville?
Construction on Walmart 217-ESS is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2025. The building is finished and very likely open.
Where is Walmart 217-ESS located?
Walmart 217-ESS is located at 801 W. Main St, Lewisville, TX, 75067, in Denton County.
Who is the owner or developer of Walmart 217-ESS?
Walmart is the property owner/developer of record for Walmart 217-ESS, per its TDLR project registration.
Who is the architect or design firm for Walmart 217-ESS?
pb2 architecture + engineering is the design firm of record for Walmart 217-ESS, according to its TDLR filing.
How much does Walmart 217-ESS cost and how big is it?
Walmart 217-ESS has an estimated construction value of $115K and approximately 100 square feet (about $1.15K/sqft), based on its TDLR filing.
๐Scope of Work
Install emergency exit doors
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 21, 2024
Review Complete
Inspection Complete
Closed
Mar 14, 2025