Muse Cafe
Muse Cafe is a renovation/alteration project at 1335 WHITESTONE BLVD SUITE 201, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2024). The project has an estimated value of $400K across about 2,500 sq ft.
๐Project Metrics
TDLR #TABS2024021859Inspection Complete
Final inspection completed, awaiting project closure
Muse Cafe is a Renovation/Alteration project located at 1335 WHITESTONE BLVD SUITE 201, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $400K covering 2,500 sq ft. Mengan Realty LLC is the property owner and Out of Line Studio LLC is the design firm of record. The project was registered with TDLR on June 27, 2024.
โFrequently Asked Questions
What is Muse Cafe?
Muse Cafe is a renovation/alteration project at 1335 WHITESTONE BLVD SUITE 201 in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out
Is Muse Cafe open in Cedar Park?
Construction on Muse Cafe is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2024. The building is finished and very likely open.
Where is Muse Cafe located?
Muse Cafe is located at 1335 WHITESTONE BLVD SUITE 201, Cedar Park, TX, 78613, in Williamson County.
Who is the owner or developer of Muse Cafe?
Mengan Realty LLC is the property owner/developer of record for Muse Cafe, per its TDLR project registration.
Who is the architect or design firm for Muse Cafe?
Out of Line Studio LLC is the design firm of record for Muse Cafe, according to its TDLR filing.
How much does Muse Cafe cost and how big is it?
Muse Cafe has an estimated construction value of $400K and approximately 2,500 square feet (about $160/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 27, 2024
Review Complete
Inspection Complete
Sep 1, 2024
Closed
๐Related Projects
๐๏ธSame Design Firm
$600K total๐Related City Permits
Building permits found at or near this location
Tenant Finish-Out For Retail Space - Suite 406 Bldg B
Express: Replace siding around the house and behind the electrical boxes
Express: Replace siding around the house and behind the electrical boxes
QT - South Shore Verison to install new fiber to existing rooftop cell equipment - OVA
Rebuilt Electrical Service replacement of the meter can and the Main Panel