Chiller
Chiller is a renovation/alteration project at 111 Dallas Street, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $700K across about 6,933 sq ft.
๐Project Metrics
TDLR #TABS2024022438Project Closed
Project has been completed and closed
Chiller is a Renovation/Alteration project located at 111 Dallas Street,, San Antonio, TX 78205 in San Antonio, Texas. The project has an estimated value of $700K covering 6,933 sq ft. Baptist Medical Center is the property owner and SBL Architecture, Inc. is the design firm of record. The project was registered with TDLR on July 5, 2024.
โFrequently Asked Questions
What is Chiller?
Chiller is a renovation/alteration project at 111 Dallas Street in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: To install an additional 850 ton chiller, CH-2. A new chilled water pump and new condenser water pump will be installed. To accommodate installation of the new chiller, A new aluminum storefront will be installed after chiller is installโฆ
Is Chiller open in San Antonio?
Construction on Chiller is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.
Where is Chiller located?
Chiller is located at 111 Dallas Street, San Antonio, TX, 78205, in Bexar County.
Who is the owner or developer of Chiller?
Baptist Medical Center is the property owner/developer of record for Chiller, per its TDLR project registration.
Who is the architect or design firm for Chiller?
SBL Architecture, Inc. is the design firm of record for Chiller, according to its TDLR filing.
How much does Chiller cost and how big is it?
Chiller has an estimated construction value of $700K and approximately 6,933 square feet (about $101/sqft), based on its TDLR filing.
๐Scope of Work
To install an additional 850 ton chiller, CH-2. A new chilled water pump and new condenser water pump will be installed. To accommodate installation of the new chiller, A new aluminum storefront will be installed after chiller is installation.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 5, 2024
Review Complete
Inspection Complete
Closed
Dec 31, 2024