Bonds Ranch & 287 is a renovation/alteration project at 133 E. Bonds Ranch Road, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $250K across about 2,200 sq ft.
Project has been completed and closed
Bonds Ranch & 287 is a Renovation/Alteration project located at 133 E. Bonds Ranch Road, Fort Worth, TX 76052 in Fort Worth, Texas. The project has an estimated value of $250K covering 2,200 sq ft. NEC 287/Bonds Ranch, Ltd. is the property owner and Design Forum Architects, Inc. is the design firm of record. The project was registered with TDLR on July 12, 2024.
Bonds Ranch & 287 is a renovation/alteration project at 133 E. Bonds Ranch Road in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of an existing Starbucks cafe that includes minor wall framing, casework, finishes, & MEP. 2200sf
Construction on Bonds Ranch & 287 is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Bonds Ranch & 287 is located at 133 E. Bonds Ranch Road, Fort Worth, TX, 76052, in Tarrant County.
NEC 287/Bonds Ranch, Ltd. is the property owner/developer of record for Bonds Ranch & 287, per its TDLR project registration.
Design Forum Architects, Inc. is the design firm of record for Bonds Ranch & 287, according to its TDLR filing.
Bonds Ranch & 287 has an estimated construction value of $250K and approximately 2,200 square feet (about $114/sqft), based on its TDLR filing.
Renovation of an existing Starbucks cafe that includes minor wall framing, casework, finishes, & MEP. 2200sf
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 12, 2024
Review Complete
Jul 12, 2024
Inspection Complete
Jan 4, 2026
Closed
May 1, 2026
541d
Construction phase