Aledias
Aledias is a additions to existing building project at 2005 Little Elm Trail Bldg 2 suite 300, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $75K across about 1,919 sq ft.
๐Project Metrics
TDLR #TABS2024022987Project Closed
Project has been completed and closed
Aledias is a Additions to Existing Building project located at 2005 Little Elm Trail Bldg 2 suite 300, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $75K covering 1,919 sq ft. Lakeline Center Cedar Park Phase VII is the property owner. The project was registered with TDLR on July 15, 2024.
โFrequently Asked Questions
What is Aledias?
Aledias is a additions to existing building project at 2005 Little Elm Trail Bldg 2 suite 300 in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: new restaurant in new bldg
Is Aledias open in Cedar Park?
Construction on Aledias is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.
Where is Aledias located?
Aledias is located at 2005 Little Elm Trail Bldg 2 suite 300, Cedar Park, TX, 78613, in Williamson County.
Who is the owner or developer of Aledias?
Lakeline Center Cedar Park Phase VII is the property owner/developer of record for Aledias, per its TDLR project registration.
How much does Aledias cost and how big is it?
Aledias has an estimated construction value of $75K and approximately 1,919 square feet (about $39/sqft), based on its TDLR filing.
๐Scope of Work
new restaurant in new bldg
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 15, 2024
Review Complete
Inspection Complete
Closed
Dec 1, 2024
๐Related Projects
๐คSame Owner
$2.5M total๐Related City Permits
Building permits found at or near this location
*Partial Demo* Interior remodel 4/17/26 SM **REVISED**: Full kitchen remodel to include removing doors and windows and a wall to open the space. Adding windows to kitchen and primary bath Cosmetic upgrades to all existing baths with a new free standing tub in primary all showers received new shower pans. New bath added in converted bedroom off of garage. Some new lighting fixtures new paint and floors.
200amp service replacement. Austin Electric is the provider.
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Express- Replace 11 existing windows size for size. Replace 1 existing entry door size for size.
INSTALL NEON FACE CHANNEL LETTERS READING HOPDODDY BURGER BAR ON SOUTHWEST ELEVATION