Daiso
Daiso is a renovation/alteration project at 5400 Brodie Lane Suite #990, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2024). The project has an estimated value of $429K across about 10,000 sq ft.
๐Project Metrics
TDLR #TABS2024023910Project Closed
Project has been completed and closed
Daiso is a Renovation/Alteration project located at 5400 Brodie Lane Suite #990, Austin, TX 78745 in Austin, Texas. The project has an estimated value of $429K covering 10,000 sq ft. CFH Realty III/Sunset Valley L.P. C/O is the property owner and The W-T Group LLC is the design firm of record. The project was registered with TDLR on July 25, 2024.
โFrequently Asked Questions
What is Daiso?
Daiso is a renovation/alteration project at 5400 Brodie Lane Suite #990 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approx 10,000 sf, interior alterations to an existing retail space as per plans.
Is Daiso open in Austin?
Construction on Daiso is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2024. The building is finished and very likely open.
Where is Daiso located?
Daiso is located at 5400 Brodie Lane Suite #990, Austin, TX, 78745, in Travis County.
Who is the owner or developer of Daiso?
CFH Realty III/Sunset Valley L.P. C/O is the property owner/developer of record for Daiso, per its TDLR project registration.
Who is the architect or design firm for Daiso?
The W-T Group LLC is the design firm of record for Daiso, according to its TDLR filing.
How much does Daiso cost and how big is it?
Daiso has an estimated construction value of $429K and approximately 10,000 square feet (about $43/sqft), based on its TDLR filing.
๐Scope of Work
Approx 10,000 sf, interior alterations to an existing retail space as per plans.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 25, 2024
Review Complete
Inspection Complete
Closed
Mar 30, 2024
๐Related Projects
๐๏ธSame Design Firm
$19.9M total๐Related City Permits
Building permits found at or near this location
Contractor will be replacing the meter jaws in a meter that is powering an apartment unit and the service disconnect. No ESPA needed due to meter can not being replaced-Hyatt This is an emergency permit pull. there is a safety concern and will require the permit to be made by Friday morning.
60 trench to replace yard sewer. Access up and under pier and beam foundation to replace cast iron drain lines
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5 Ton Horizontal Gas System
Install Level 2 EV Charger